top of page
Search


Key Design Considerations for Steel Structure Buildings with 100 Ton Overhead Cranes
Designing a steel structure building to accommodate a 100-ton overhead crane is a complex engineering task that requires meticulous planning and careful consideration of multiple factors. The integration of such a high-capacity crane influences the structural design, safety, operational efficiency, and long-term durability of the facility. From load-bearing capacity to layout planning, understanding the key design considerations is essential for architects, structural enginee
blog@ellsenbridgecrane.com
Dec 75 min read


Multi 30 Ton Overhead Crane Operation Planning in a Single Steel Structure Factory
Overhead cranes are critical assets in steel structure factories, enabling the safe and efficient movement of heavy loads. When a factory operates multiple 30-ton overhead cranes within a single steel structure workshop, careful planning is essential to maximize productivity, ensure safety, and minimize operational conflicts. This article explores the strategies, considerations, and best practices for planning multi-crane operations in a steel structure environment. Understan
blog@ellsenbridgecrane.com
Dec 15 min read


Impact of Duty Cycle on Overhead Crane and Building Steel Structure Design
When designing an overhead crane system and the supporting steel structure of an industrial building, one of the most critical yet often misunderstood parameters is the duty cycle . The duty cycle determines how intensively and frequently a crane operates, influencing not only the mechanical design of the crane but also the structural design of the building that supports it. Understanding this relationship is essential to ensure safety, performance, and cost efficiency in man
blog@ellsenbridgecrane.com
Nov 115 min read
bottom of page




